info@kaskad-pr.com
The complexity and the shape of the pool made of framework do not affect its cost
Leave-in-place formwork provides:
Using our formwork made of polypropylene
+7 (800) 777 30 86
The pool walls turn out to be smooth and do not need any additional flattening, and are ready for lining
The bottom plate and the side walls are poured over in one stage, which prevents from leaving the cold joints
SALES OFFER
1 meter of formwork = 110€
SALES OFFER
EN
RU
info@kaskad-pr.com
The complexity and the shape of the pool made of framework do not affect its cost
Leave-in-place formwork provides:
Using our formwork made of polypropylene
+7 (800) 777 30 86
The pool walls turn out to be smooth and do not need any additional flattening, and are ready for lining
The bottom plate and the side walls are poured over in one stage, which prevents from leaving the cold joints
SALES OFFER
1 meter of formwork = 110€
SALES OFFER
EN
RU
BENEFITS
In case you build using conventional formwork:
1
Installation work period takes 2 weeks at average
2
Complexity of different shape formwork installation
3
5
4
6
Need for employing professional team of reinforced concrete builders
Additional works on designing the formwork, creating the formwork geometry, plaster work, skimcoating with special solutions, which extend the project implementation period significantly
High reinforcement consumption
High concrete consumption
1
Save time for pool basin construction - up to 60%
2
Install different shape ready-made formwork easily
3
5
4
6
The pool basin dimensioned 3х6 meters is installed by two specialists during 2 days at average
Obtain ready-made surface immediately, which does not need any plasterwork or skimcoating
Save the reinforcement - up to 70%
Save the concrete - up to 40%
In case you build using our formwork:
BENEFITS
In case you build
using conventional formwork:
1
Installation work period takes 2 weeks at
2
Complexity of different shape formwork installation
3
5
4
6
Need for employing professional team of reinforced concrete builders
Additional works on designing the formwork, creating the formwork geometry, plaster work, skimcoating with special solutions, which extend the project implementation period significantly
High reinforcement consumption
High concrete consumption
1
Save time for pool basin construction - up to 60%
2
Install different shape ready-made formwork easily
3
5
4
6
The pool basin dimensioned 3х6 meters is installed by two specialists during 2 days at average
Obtain ready-made surface immediately, which does not need any plasterwork or skimcoating
Save the reinforcement - up to 70%
Save the concrete - up to 40%
In case you build using our formwork:
BENEFITS
In case you build
using conventional formwork
1
Installation work period takes 2 weeks at average
2
Complexity of different shape formwork installation
3
5
4
6
Need for employing professional team of reinforced concrete builders
Additional works on designing the formwork, creating the formwork geometry, plaster work, skimcoating with special solutions, which extend the project implementation period significantly
High reinforcement consumption
High concrete consumption
1
Save time for pool basin construction - up to 60%
2
Install different shape ready-made formwork easily
3
5
4
6
The pool basin dimensioned 3х6 meters is installed by two specialists during 2 days at average
Obtain ready-made surface immediately, which does not need any plasterwork or skimcoating
Save the reinforcement - up to 70%
Save the concrete - up to 40%
In case you build using our formwork
PROCESS
Download the cost estimate of the pool made of our framework
PROCESS
Download the cost estimate
of the pool made of our framework
WORK STAGES
Stage 1
We provide you a new product
1
You send a new project to us; we calculate the formwork amount and make out an invoice
2
We make up a set of formwork
3
We send the product with a shipping company
4
You receive the ready-made products and the comprehensible instructions for pool basin installation
Stage 2
You install the pool according to our instructions
1
Dig out the foundation pit according to dimensions
2
) Level it off with crushed stone (according to SNiP 3.02-01-83) and ram it
3
Install the blocks with 2 meter spacing along the pool perimeter

4
Install the formwork using counterforts
5
Reinforce the pool bottom and walls
6
First, pour over the walls and then - the bottom with concrete in parallel
7
Install the embedded parts or the filtering unit
8
Lay down the liner into the pool basin
WORK STAGES
Stage 1
We provide you a new product
1
You send a new project to us; we calculate the formwork amount and make out an invoice
2
We make up a set of formwork
3
We send the product with a shipping company
4
You receive the ready-made products and the comprehensible instructions for pool basin installation
Stage 2
You install the pool according to our instructions
1
Dig out the foundation pit according to dimensions
2
Level it off with crushed stone (according to SNiP 3.02-01-83) and ram it
3
Install the blocks with 2 meter spacing along the pool

4
Install the formwork using counterforts

5
Reinforce the pool bottom and walls
6
First, pour over the walls and then - the bottom with concrete in parallel
7
Install the embedded parts or the filtering unit
8
Lay down the liner into the pool basin
WORK STAGES
Stage 1
We provide you a new product
1
You send a new project to us; we calculate the formwork amount and make out an invoice
2
We make up a set of formwork
3
We send the product with a shipping company
4
You receive the ready-made products and the comprehensible instructions for pool basin
Stage 2
You install the pool according to our instructions
1
Dig out the foundation pit according to dimensions
2
Level it off with crushed stone (according to SNiP 3.02-01-83) and ram it
3
Install the blocks with 2 meter spacing along the pool perimeter

4
Install the formwork using counterforts

5
Reinforce the pool bottom and walls
6
First, pour over the walls and then - the bottom with concrete in parallel
7
Install the embedded parts or the filtering unit
8
Lay down the liner into the pool basin
CONTACTS
420110, Russia, Tatarstan republic, Kazan, Safiullina st., 6b
info@kaskad-pr.com
+7 (800) 777-30-86
CONTACTS
420110, Russia, Tatarstan republic, Kazan, Safiullina st., 6b
info@kaskad-pr.com
+7 (800) 777-30-86
CONTACTS
420110, Russia, Tatarstan republic, Kazan, Safiullina st., 6b
info@kaskad-pr.com
+7 (800) 777-30-86